Heat / Electric Usage Guide
Heat supply procedure
Heat facilities guide
Electricity supply procedure
Electric usage manual
Electricity rate system
Electricity supply procedure guide
-
- 1. Electricity use application form: Please send it by direct mail, fax or refer homepage (www.cncityenergy.com)
- - Electricity application form (Ⅰ): Contract power 5㎾ or less
- - Electricity application form (Ⅱ): Contract power 6㎾ or more
- 2. Application form : Download file from homepage
- 1. Electricity use application form: Please send it by direct mail, fax or refer homepage (www.cncityenergy.com)
-
- 1. Visiting Reception : By the customer or By an electrician
- Reception Office : 189 Kagahara Yuseong-gu, 3F Office of Collective Energy Office
- 2. Fax: 042-336-5913 / Call after fax: 042-336-5600
- 1. Visiting Reception : By the customer or By an electrician
-
- 1. Measuring the distance from the underground manhole to the entrance
- Check measurement result : confirmation of customer or field manager
- 1. Measuring the distance from the underground manhole to the entrance
-
- 1. Billing cost : Send facillity contribution giro(Billing, email, fax)
- 2. Payment of Facility Fees : Payment by bank transfer or giro payment (Including statement of cost calculation)
- 3. Confirmation of payment of facillity contribution : Notification of deposit of designated financial institution
-
- 1. Underground construction work
- 2. Pre-use Inspection: Check whether the rated capacity of the cable is used and tmeasure the ground resistance.
-
- 1. Dispensing and installation of meter : Installation of meter per unit and checking of operation condition
- 2. Panel board check: Check whether rated circuit breaker or protective device is installed
-
- 1. Extension Equipment Check : Use of certified product, ground resistance measurement
- Ground resistance : Class 1 ground: less than 10Ω, Class 3 ground: less than 100Ω
- 2. Transmission and Sealing
- 1. Extension Equipment Check : Use of certified product, ground resistance measurement